CSC’s floor screeding reaches new heights

CSC Floor Screeding operatives stand back and watch our screed pump being lifted over the building at a construction site for PDR Builders.

The general access to the project is limited and CSC strategically plan the operational process to include sand deliveries in dumpy bags on a flat bed truck. The tower crane will directly lift the sand into place from the roadside.

Posted in:

Leave a Reply

Your email address will not be published. Required fields are marked *