Grade II Listed? Busiest part of London? Call CSC – Job Done

[casestudybox img=”http://blog.cscscreeding.co.uk/wp-content/uploads/lancasters.jpg”]

Job done

[/casestudybox]

[casestudybox img=”http://blog.cscscreeding.co.uk/wp-content/uploads/lancasters2.jpg”]

This was a large scale project located in one of the busiest parts of London. The Lancasters is a Grade-II listed former hotel which has been restored to modern specifications.  CSC laid the fast drying floor screed FlexiDry for an area of 16,000m2 which also included underfloor heating.
[/casestudybox]

[casestudybox img=”http://blog.cscscreeding.co.uk/wp-content/uploads/lancasters1.jpg”]

Lancasters

[/casestudybox]

[casestudylink]

Read the full case study in this PDF..

[/casestudylink]